<pre id="dwra4"></pre>
    <dfn id="dwra4"></dfn>
  • <pre id="dwra4"></pre>

    1. Welcome to Jiang su Fang Yang Mechanical and Electrical Equipment Co., Ltd. by Share Ltd official website!
      聯(lián)系我們-騰龍公司開戶聯(lián)系電話19987877778(代理)

      聯(lián)系我們-騰龍公司開戶聯(lián)系電話19987877778(代理)

       
      Contact us
       
      Industry news

      The fourth anniversary of the East-Middle Route of the South-to-North Water Transfer Project has accumulated 22.2 billion cubic meters of water diversion.

      Release time:2018-12-22 12:59:49    Click rate:1321   

      According to the National News Broadcast of Voice of China, since the first phase of the South-to-North Water Transfer Project was officially opened on December 12, 2014, the East-to-Middle Route Project has been fully opened for the fourth anniversary, with a total of 22.2 billion cubic meters of water diverted. The water supply continues to increase rapidly, optimizing the allocation pattern of water resources in China, effectively supporting the economic and social development of water receiving areas and water source areas, and making every effort to promote the construction of ecological civilization. Located on the Hutuo River in the outskirts of Shijiazhuang City, Hebei Province, it has abundant water flow, clear water quality and lush grass and trees on both sides. It's hard to imagine that it had dried up for many years before the middle route of the South-to-North Water Transfer Project was opened to water. Shi Xiaoxu, a resident along Hutuo River, recalled, "I was in a high school across the river. Before treatment, this is a big sand pit. Once a car passes, it is very dirty and dusty. After so many years of governance, one is convenient transportation, the other is a good environment, and the third is a place to play. After the river is watered, I think there are many people on both sides of the river. If the weekend is OK, I often bring my children. This year, the Hebei Provincial Department of Water Conservancy carried out the water supply work of Hutuo River, Fuyang River and Nanjuma River. On September 13, the drainage gate of the middle route of the South-to-North Water Transfer Project began to discharge water, and the water supply work was officially launched. Among them, the maximum time of recharge of Hutuo River is 85 cubic meters per second. According to Ding Xinge, deputy inspector of Hebei Provincial Water Resources Department, 119 groundwater monitoring data showed that the effect was distinct compared with the data from September 13 when the water supply began. The average groundwater rise of the three rivers is more than 0.5 meters, and the most obvious one is the Hutuo River. 37 of the 70 observation points have increased significantly, accounting for 53%. Among them, the groundwater level of Xicaolu in Raoyang County of Hutuo River rose the most, reaching 5.43 meters. Since the South-to-North Water Transfer Project was introduced, not only the benefits of ecological water supplement have gradually emerged, but also the water quality has been significantly improved. Du Xiaona, a citizen of Shijiazhuang, said, "The water from the South-to-North Water Transfer Project has been used in our city circle, including the people around us. Now the water quality is particularly good. In the past, there was a large layer of scale, but now there is no more, and the taste of the water is much better than before." Up to now, the first phase of the South-to-North Water Transfer Project has transferred 19.1 billion cubic meters of water, providing 1461 days of uninterrupted water supply, and the first phase of the East Water Transfer Project has supplied 3.1 billion cubic meters of water to Shandong. It took nearly three years for the first phase of the Middle East Railway Project to be completed, from 10 billion cubic meters to 20 billion cubic meters, which took only one year. Yuan Qitian, deputy director of the South-to-North Water Transfer Department, said: "The water supply guarantee along the project has been greatly improved. South water has become the main source of water for more than 40 large and medium-sized cities in Beijing, Tianjin, Hebei, Henan and Shandong areas, and more than 100 million people in the Huanghuai-Haihai Plain have benefited directly. The total beneficiary population of the midline project is over 530 million. The total beneficiary population of the Eastern Route Project is more than 660 million, of which the Shandong Jiaodong Peninsula has achieved full coverage of the South Water. In view of the next focus of the South-to-North Water Transfer Project, Yuan Qitian said, "We should focus on solving the three major water security problems of water shortage, water ecological damage and water environmental pollution in the new era; provide more high-quality ecological products to meet the growing needs of the people's beautiful ecological environment; and support the construction of ecological civilization and beautiful China in the new era."
      An article:Start in 2019!
      next one:Main Components of Hydraulic Hoist
       
      Home page          About us           Product           Information          Solution          Recruitment           Message           Contact us
      Jiang su Fang Yang Mechanical Electrical Equipment Co., Ltd.
      Telephone:15380377877   Contact: Mr Jiang
      蘇ICP備19050628號
      YW193亚洲中文字幕无码一区,欧美高清久久久久久69,一区无码内射国产,精品欧洲AV一区二区三区
      <pre id="dwra4"></pre>
      <dfn id="dwra4"></dfn>
    2. <pre id="dwra4"></pre>