<pre id="dwra4"></pre>
    <dfn id="dwra4"></dfn>
  • <pre id="dwra4"></pre>

    1. Welcome to Jiang su Fang Yang Mechanical and Electrical Equipment Co., Ltd. by Share Ltd official website!
      聯(lián)系我們-騰龍公司開(kāi)戶聯(lián)系電話19987877778(代理)

      聯(lián)系我們-騰龍公司開(kāi)戶聯(lián)系電話19987877778(代理)

       
      Contact us
       
      Industry news

      Ministry of Water Resources Website: Conference on Water Resources Project Operation and Management

      Release time:2019-03-05 15:28:11    Click rate:1287   

      Source: Ministry of Water Resources website From Feb. 27 to Feb. 28, a conference on the operation and management of water conservancy projects was held at Xiaolangdi Water Conservancy Project. The main task of the conference is to fully implement the spirit of the Nineteenth National Congress of the CPC, to take Xi Jinping's socialist ideology with Chinese characteristics in the new era as the guide, to implement the general tone of water resources reform and development, to summarize and exchange the operation and management of water projects, to analyze the current situation and tasks, and to arrange for the deployment of key tasks in the next stage, in accordance with the overall requirements of the National Conference on Water Resources. Ye Jianchun, Vice Minister of Water Resources, attended the meeting and delivered a speech. Liu Weiping, Chief Engineer of the Ministry of Water Resources, made a summary of the meeting. Ye Jianchun pointed out that through many years of perfecting the system, deepening the system reform, implementing the reinforcement and standardizing the operation management, the overall safety of water conservancy projects can be controlled, the overall operation is stable and the benefits can be brought into full play, which provides an important guarantee for economic and social development. The operation management of water conservancy projects has achieved remarkable results and laid a preliminary foundation for the next stage of work. Ye Jianchun pointed out that managing and utilizing water conservancy projects well is a new requirement for operation and management in the new era of water conservancy reform and development. It is necessary to have a deep understanding of the new era of water conservancy project safety and the higher requirements of water conservancy project mending board and strong supervision of water conservancy industry for operation and management of water conservancy projects, so as to accurately grasp the situation faced by operation and management of water conservancy projects in the new era. Ye Jianchun stressed that it is of great significance to do a good job in the operation and management of water conservancy projects in 2019. We should closely focus on the main contradictions of water control in China at present, take engineering safety as the core, ensure the safety of reservoirs, especially small reservoirs, as the primary task, and comprehensively improve the operation and management level of water conservancy projects in accordance with the general keynote of water reform and development. First, we should conscientiously implement the three-year action plan for strengthening the safe operation and management of small reservoirs. The safety of small reservoirs is closely related to the safety of people's lives and property and social stability. All localities should raise their ideological awareness, strengthen their organization and leadership, strengthen coordination and linkage, and strictly supervise and evaluate the reservoirs so as to ensure the effectiveness of the three-year action. The second is to find out the base number of water projects in an all-round way. We should improve the basic data of reservoir and dike waterproof sluice as soon as possible, accurately grasp the quantity and basic information of the project, and lay a solid foundation for reinforcing supervision. Third, we should improve the system of operation and management of water conservancy projects. It is necessary to revise the safety management measures for small reservoirs, improve the management system and technical standards for small reservoirs and sluice dikes, and provide institutional basis for standardizing engineering management behavior. Fourth, accurately grasp the safety situation of water conservancy projects. It is necessary to carry out spot checks and reviews of small-sized dangerous reservoirs, establish a list of dangerous sections of dykes, check dangerous sluices, and accurately grasp the safety situation of projects, so as to lay a foundation for compiling the implementation plan of flood control and drought relief water conservancy upgrading projects. Fifth, deepen the reform of management system of water conservancy projects. We should focus on the reform of the management system of small reservoirs, organize and carry out pilot projects on the management model of small reservoirs, actively raise management funds, promote the separation of management and maintenance, and constantly deepen the reform. Sixth, vigorously improve the level of information technology in water conservancy projects. We will speed up the development and popularization of App, a mobile phone for the management of basic data and information of reservoirs and dams throughout the country, speed up the construction of a national platform for monitoring and supervision of large reservoirs and dams, and promote the construction of safety monitoring and early warning facilities for reservoirs and dams and other water conservancy projects. Seventh, to carry out in-depth supervision of water conservancy projects and rectification of problems. Focusing on small reservoirs, we should strengthen the supervision of operation and management, pay close attention to the rectification and implementation of problems, and comprehensively improve the management level of water conservancy projects. Eighth, we should do our best to ensure the safety of water conservancy projects in flood season. We will continue to pay close attention to the key work of flood control for small reservoirs and attach great importance to the safety of dangerous reservoirs and embankments in northern rivers. Ninth, efforts should be made to strengthen the construction of water conservancy project operation management team. Effectively raise ideological awareness, strengthen the conduct and capacity building, and provide a solid ideological and organizational guarantee for the operation and management of water conservancy projects. Liu Weiping pointed out that in the new era, new tasks and objectives have been put forward for the operation and management of water conservancy projects from three aspects: the red line requirement for ensuring safety, the basic requirement for bringing into full play the functions and benefits and the higher level requirement for modern management. All localities should implement the spirit of the conference, change their ideas and raise their awareness, and do a good job in standardized management of water conservancy projects, safe flood season, information construction and water management. Key tasks such as delimitation of water conservancy projects, research on key issues, formulate work plans and implementation plans, transfer pressure layer by layer to fulfill responsibilities, and promote the operation and management of water conservancy projects to a new level. The heads of water resources (water) departments (bureaus) of provinces (autonomous regions, municipalities directly under the Central Government) and water resources (water) bureaus of cities with separate plans, water resources bureaus of Xinjiang Production and Construction Corps and water resources engineering operation management offices (offices) participated in the meeting. Author: Editorial Responsibility: Wei Yongjing
      An article:Jiangsu Fangyang Mechanical & Electrical Equipment Co., Ltd: Selection of parameters of hydraulic hoist
      next one:Chinese Academy of Water Conservancy and Hydropower Sciences: China Water Conservancy: Today in History (1949-2010)
       
      Home page          About us           Product           Information          Solution          Recruitment           Message           Contact us
      Jiang su Fang Yang Mechanical Electrical Equipment Co., Ltd.
      Telephone:15380377877   Contact: Mr Jiang
      蘇ICP備19050628號(hào)
      YW193亚洲中文字幕无码一区,欧美高清久久久久久69,一区无码内射国产,精品欧洲AV一区二区三区
      <pre id="dwra4"></pre>
      <dfn id="dwra4"></dfn>
    2. <pre id="dwra4"></pre>